AAA Storage’s work starts with in-depth site evaluation and planning. Zoning is verified and site constraints—like impervious coverage maximums—are mapped out to shape the preliminary layout. Utility access is assessed, with cost and timeline impacts factored in if connections require building out to distant infrastructure. The local competitive set is evaluated to gauge demand and maximize project viability. Early collaboration with the Department of Transportation identifies whether required improvements such as deceleration lanes or road adjustments will affect the project scope or budget. Every potential risk or variable cost is considered in advance, with financial projections updated to reflect confirmed requirements.
Permitting follows a set progression. Initial focus is on civil engineering: sitework, drainage, and utility design. Only after these aspects are locked in do architectural plans for the self storage buildings progress. AAA Storage’s in-house architect customizes each set to satisfy regulatory requirements—including fire separation, building size limits, and exterior materials—while prioritizing build cost and efficiency. Jurisdiction complexity is weighed carefully; developing in less restrictive suburban areas can trim months off permitting timelines and simplify requirements.
Efficient Construction Sequencing and Phased Delivery
Construction moves from horizontal to vertical in clear stages. Site grading and dirt work take priority, with expertise applied to minimize offsite hauling or imported fill. Utilities are scheduled for timely delivery, especially for power transformers or water service that require substantial lead times. As sitework concludes, concrete slabs are poured, forming the base for pre-engineered steel buildings. Facilities are constructed in phases to align with leasing expectations. Pads for future phases are often poured together with the initial build to reduce interruptions and lower per-unit costs.
Leasing rates drive the timeline for expanding into phase two or subsequent buildings. Once benchmark occupancy is reached—usually 60% or higher—construction on the next set of units begins, ensuring the facility grows in line with actual demand. Stormwater management is integrated into the earliest civil designs, minimizing regulatory friction and ensuring lasting site performance.
In-House Craftsmanship, Value Engineering, and Batch Efficiencies
Self-performing critical tasks keeps AAA Storage competitive. Roofing and fencing work is managed by specialized internal crews using bulk steel purchased directly. Steel roof panels are shaped on site for each project, enabling faster dry-in times and more reliable waterproofing. Security fencing utilizes the same fabricated panels, creating privacy and protecting tenant assets from view. This in-house process reduces dependency on subcontractors and compresses schedules.
Design standardization delivers additional value. Reusing plans for site offices and manager apartments streamlines design costs and allows AAA Storage to purchase materials in bulk. Internal benchmarking shows cost per square foot is regularly 10–15% below industry averages for comparable facilities. Repetition and disciplined materials sourcing are central to this cost advantage.
Seamless Transition from Construction to Operations
Project wrap-up centers on meeting local inspection standards and securing certificates of occupancy. Final walkthroughs, utility hookups, and installation of entry gates and security cameras prepare each facility for launch. The operations team’s handoff is carefully coordinated in advance; marketing and pre-leasing can begin as soon as the project is cleared for opening. For industrial flex properties, the core structure’s CO is followed by customized tenant build-outs, executed by AAA’s team to match lease requirements, manage fit-outs, and maintain close control. By managing every phase in-house and staying attentive to cost, timing, and design, AAA Storage delivers assets that perform from the first day of operation and support strong, enduring returns for investors.